American-Made Geogrids & Gabions Satisfy NYDOT Specs For Road & Bridge Stabilization

New York's Old Route 17 and the Redhouse Bridge were in need of an overhaul in order to meet NYDOT safety standards. We helped get the job done with a rugged, American-made geogrid for road stabilization that was compliant with NYDOT specifications.

old route 17 rehab hx165-geogrid and gabions hero
Customer:
NYDOT
Location:
Salamanca, NY

Download Case Study

Background

Old Route 17 Highway in New York was in poor condition and required re-stabilization. Furthermore, the Redhouse Bridge that carries Old Route 17 over the Allegheny River was slated for replacement to meet safety standards. NYDOT contacted Ferguson Waterworks for American-made road stabilization solutions. In total, nearly 5.7 miles of the former Route 17 needed replacement.

Solution

After assessment, the team planned to scrape down the base of Old Route 17 to incorporate a new geogrid for road stabilization. In addition to shipping 99,502 square yards of Tensar HX165 Geogrid, Ferguson Waterworks also supplied over 500 gabion baskets for the bridge rehabilitation project.  In addition, Maccaferri Gabions were utilized.

All stabilization products were American-made and per NYDOT specifications.

Product Advantages

In short, geogrid stabilized the roadbed and prolonged its life. Meanwhile, the gabion baskets added rugged stability to the new bridge.

Tensar HX165 Geogrids:

  • Both stabilize soft subgrades and also improve pavement performance
  • Optimize the interlock of fill material creating an efficient base layer
  • Require less fill material which reduces overall project costs

View Similiar Case Studies


Case studies - results from installing permeable paving & machine technology to get an abandoned site and parking lot up to stormwater code

In order to revitalize and meet stormwater codes, the abandoned parking area at the Shoppes at Fashion Square in Orlando, FL, required updates. With a permeable paving system and machine technology, we helped the client achieve their goals, save $1 million, and complete the project in just 10 days.

Case studies - Contractors mitigated runoff at a solar farm in Roanoke Rapids, NC

See how contractors mitigated erosion and sediment runoff at a solar farm in Roanoke Rapids, NC.

Products: ShearForce
Solar Farm Mount Jackson

Learn how Ferguson Waterworks addressed some concerning erosion problems on a solar farm in Mt. Jackson, VA.

Products: ShearForce

Case Studies

From solving challenging application issues to severe weather response, there is no better partner than Ferguson Waterworks. Let our past performance speak for itself.

ferguson industrial case studies hero

Start Your Project Today