ARMORMAX® 75 Armors New Orleans Levee
Ferguson Waterworks helps protect New Orleans by aiding in the planning, supplying, and installation of ARMORMAX® 75 across 70 miles of earthen levees.
Download Case Study
Background
Following the catastrophic damage of Hurricane Katrina in 2005, the U.S. Army Corps of Engineers, New Orleans District, embarked on one of the largest and most comprehensive public works projects in American history. The Hurricane and Storm Damage Risk Reduction System (HSDRRS) constructed over $14 billion of flood protection improvements. These improvements included levee enlargements, pump stations, and closure complexes.
One of the most critical measures of the HSDRRS was the protection of refurbished earthen levees against the erosion-causing hydraulic forces of storm surge overtopping.
Problem
Prevent earthen levee damage caused by storm surge overtopping. In addition, the recommended system required vigorous testing to ensure it met USACE design standards.
How is Ferguson Waterworks helping to protect New Orleans with ARMORMAX® 75?
In short, we aided the New Orleans team in the planning, distribution, and installation of high-performance turf reinforcement mats, ARMORMAX® 75, across 70 miles of earthen levee.
ARMORMAX® 75 Features & Benefits
ARMORMAX 75 is a superior and highly tested storm surge solution that both armors and provides levee resiliency. Now, it is the new standard for levee protection.
- Immediate and Sustainable Protection
- Improved Levee Resiliency
- Proven Performance in Overtopping
- UV Resistant for up to 75 Years of Design Life
- Rapid and Easy Installation
- Quicker Vegetation Establishment with X3® Technology
- Resists Wildlife and Maintenance Damages
View Similiar Case Studies
In order to revitalize and meet stormwater codes, the abandoned parking area at the Shoppes at Fashion Square in Orlando, FL, required updates. With a permeable paving system and machine technology, we helped the client achieve their goals, save $1 million, and complete the project in just 10 days.
With solar panels in place and operational, an immediate and effective erosion control solution was imperative. Especially considering the panels were positioned next to channels, drip lines, and spillways.
After failed attempts to stabilize the earth at the Mt. Jackson Solar Farm, they required an immediate, cost-effective erosion control solution. Ferguson Waterworks was brought on board to address their ongoing concerns.