Steiner Ranch Emergency Evacuation Route

How did Ferguson Waterworks help support a steep and curvy evacuation route to ensure road stabilization, reliability, and integrity?

Steiner Ranch Emergency Evacuation Route
Customer:
Travis County
Location:
Austin, Texas

Download Case Study

Challenge

Travis County wanted a pervious pavement option for an emergency evacuation route out of a large neighborhood, Steiner Ranch, in West Austin. Due to the route’s steep slopes and curves, the county was concerned about installing and maintaining the roadway.

Our Solution

After reviewing the project, Ferguson Waterworks product specialists recommended installing a GeoWeb-supported gravel roadway. With expert solutions and fast turnarounds, we facilitated the quick distribution of our Cellular Confinement system. As a result, the county reinforced the gravel pavement structure for long-term support and durability.

Product Advantages

Ferguson’s Cellular Confinement system added structural support to gravel pavement structures. Consequently, fire trucks and other heavier loads do not rut the road. Furthermore, it allows water to infiltrate the pavement and therefore it meets their pervious pavement requirement. The thickness of the GeoWeb holds the aggregate into place. As a result, it reduces the amount of maintenance needed for a gravel road. Not to mention, this subsurface stabilization for roads does not require heavy equipment for installation. Simply spread the Cellular confinement panels by hand and stake them into the ground.

Why Ferguson Waterworks?

Travis County relied on Ferguson Waterworks because our experienced team has a reputation for providing innovative, cost-competitive, and comprehensive stabilization solutions. For this project in particular, we presented several alternative approaches to constructing a low-maintenance road that can withstand heavy loads. From supplying detailed estimates to explaining product service life and more, our client was able to make smart decisions for their project.

Ferguson Waterworks prides itself on being more than a distributor of high-quality products – rather, we are your supply partner. From engineering assistance and research to jobsite support and maintenance, trust us to stand side-by-side during your entire project and beyond.

View Similiar Case Studies


Case studies - results from installing permeable paving & machine technology to get an abandoned site and parking lot up to stormwater code

In order to revitalize and meet stormwater codes, the abandoned parking area at the Shoppes at Fashion Square in Orlando, FL, required updates. With a permeable paving system and machine technology, we helped the client achieve their goals, save $1 million, and complete the project in just 10 days.

ShearForce 10 installed beneath and around operational solar panels in order to prevent erosion.

With solar panels in place and operational, an immediate and effective erosion control solution was imperative. Especially considering the panels were positioned next to channels, drip lines, and spillways.

Products: ShearForce
Mt Jackson Solar 02

After failed attempts to stabilize the earth at the Mt. Jackson Solar Farm, they required an immediate, cost-effective erosion control solution. Ferguson Waterworks was brought on board to address their ongoing concerns.

Products: ShearForce

Case Studies

From solving challenging application issues to severe weather response, there is no better partner than Ferguson Waterworks. Let our past performance speak for itself.

ferguson industrial case studies hero

Start Your Project Today