Timber Wall Replacement in Mechanicsville, VA

See how replacing a bowing timber wall with high-performance turf reinforcement mats resolved a precarious situation and protected a hill from erosion.

Case studies - Results of a successful timber wall replacement in Mechanicsville, VA
Customer:
Mechanicsville
Location:
Mechanicsville, VA

Download Case Study

Initial Concern

The client contacted us for assistance in finding a solution for a timber wall behind an office complex that was bowing out and causing an unsafe situation for anyone behind the building. As seen in the photos below, the wall was no longer considered stable and needed to be fixed quickly and carefully.

Goal

The client desired a product that would permanently protect the hill from eroding and also provide a aesthetically pleasing result.

Installation & Solution

After careful consideration, Armormax was chosen to replace the timber wall due to its lifespan (up to 75 years) and benefit of providing vegetation growth. The install required that the timber wall be removed and the surface of the slope be smoothed before work could begin. In this specific install, it was discovered that a trench drain was required at the bottom of the slope due to water seepage. Following the installation of the high performance turf reinforcement mat, the system was secured in place with washer pins and Engineered Earth Anchors. The Engineered Earth Anchors were critical to the install as they help protect against hydraulic stresses and provide slope stabilization. Once the installation of the Armormax was complete, the product was covered with soil, seed and straw erosion control mats.

Result

The Armormax installation turned out wonderfully, with the vegetation quickly beginning to grow through the mats. A final installation picture showing 3 weeks of growth can be seen above. The client and surrounding tenants are thrilled with the result and are excited to see the final product when the vegetation has more opportunity to grow without the summer heat.

View Similiar Case Studies


Case studies - results from installing permeable paving & machine technology to get an abandoned site and parking lot up to stormwater code

In order to revitalize and meet stormwater codes, the abandoned parking area at the Shoppes at Fashion Square in Orlando, FL, required updates. With a permeable paving system and machine technology, we helped the client achieve their goals, save $1 million, and complete the project in just 10 days.

ShearForce 10 installed beneath and around operational solar panels in order to prevent erosion.

With solar panels in place and operational, an immediate and effective erosion control solution was imperative. Especially considering the panels were positioned next to channels, drip lines, and spillways.

Products: ShearForce
Mt Jackson Solar 02

After failed attempts to stabilize the earth at the Mt. Jackson Solar Farm, they required an immediate, cost-effective erosion control solution. Ferguson Waterworks was brought on board to address their ongoing concerns.

Products: ShearForce